Planned re-roofing · Tile and metal

Roof Replacement Sydney

A roof at the end of its service life stops rewarding repairs: cracked tiles multiply, pointing crumbles into the gutters and rust travels faster than patching can follow. Replacing the whole covering, with fresh sarking and battens underneath, resets the clock for decades. Describe your roof and receive a quote scoped for the complete job.

Roofing in NSW is licensed work: roof tiling and roof plumbing are distinct specialist categories, and residential building contracts above the statutory threshold require a contractor licence, with home building compensation cover applying to larger jobs. Check any contractor's licence against the NSW Fair Trading public register before signing anything.

Where re-roofs run

Sydney regions this site scopes for

Roof stock varies by region, terracotta ages differently in salt air than concrete tile does on the plains. Find your area for what replacement usually involves there.

Re-roofing services

Every layer of the roof, renewed

01Concrete & terracotta

Tile roof replacement

Stripping tired concrete or terracotta and re-laying a complete new tiled covering.

02Steel roofing

Colorbond metal re-roofing

New Colorbond sheeting over renewed battens, flashings and an anti-condensation blanket.

03Conversion

Tile-to-metal conversion

Swapping a heavy tiled roof for lightweight steel, with the frame reviewed and re-battened.

04Substrate renewal

Sarking, battens & roof timbers

The layers beneath the covering (sarking, battens and repairs to roof timbers) handled while the roof is open.

05Roof plumbing

Gutters, fascia & roof plumbing

New guttering, downpipes, fascia and valley work sized to current rainfall codes.

Straight answers

Re-roofing questions

Tile or Colorbond for a Sydney re-roof?

Neither wins outright. Tile offers thermal mass, quieter rain noise and simple single-tile repairs; steel is lighter, quicker to install and easier under solar. Coastal exposure, frame capacity, bushfire rating and the surrounding streetscape usually decide it, the quote stage weighs both against your specific site.

How long does a full roof replacement take?

A typical single-storey home runs from several days to a couple of weeks depending on size, access and weather. Work is staged so the house is never left open, each section stripped is re-covered or weather-sealed before the crew finishes for the day.

Can new roofing go over the existing tiles?

Overlaying is not standard practice here. It traps the old covering's problems, adds weight the frame was never asked to carry, and hides the battens and timbers that most need inspection. Stripping to the frame is the orthodox approach and what quotes on this site describe.

What happens with my solar panels?

Panels are removed by an appropriately accredited installer before the strip, stored safely, then refitted with new mounting hardware and flashings once the covering is on. It adds a line to the scope and a day or two to the program, and it is far cheaper than working around live panels.

Could the job disturb asbestos?

Homes built before 1990 may carry asbestos in eaves linings, old sheeting or gable ends. Suspect materials are identified before the strip and handled by licensed removalists under their own controls, never as an improvised extra on the day.

Does a re-roof need council approval?

Like-for-like recovering is generally treated as exempt development in NSW provided standard conditions are met. Changing materials, altering the roofline or working on a heritage-listed property can require approval, and the scoping stage confirms which path applies to your job.

Stay off the roof. Aged tiles crack underfoot, brittle sheeting can fail without warning, and unprotected edges cause serious falls. Photograph from the ground or a window and leave the climbing to crews with edge protection and the right equipment.

How it works

How a re-roof comes together

  1. 01

    Describe the roof

    Covering type, approximate house age, number of storeys, and photos from the street plus inside the ceiling space give enough to shape a realistic scope.

  2. 02

    Site measure and materials

    A physical inspection confirms measurements, batten condition and access, and settles selections: tile profile or steel grade, colours, sarking class and drainage layout.

  3. 03

    Fixed scope with provisional items

    The quote separates certain work from provisional items such as concealed timber repairs, so anything found at strip stage is priced by an agreed method rather than argued about later.

  4. 04

    Strip, install, certify

    The old covering comes off in weather-managed sections, the new roof goes on with its flashings and plumbing, and documentation covering the licensed work is handed over at completion.

Re-roofing services

Tell us about the job

Send through the job details and we'll connect you with a licensed provider who can quote this work.

If this is an emergency or anyone is at immediate risk, contact the relevant emergency service or your network or utility operator directly instead of using this form.